Ltd. with an annual output of 8.2 million sets of new energy automobile and motorcycle parts and electrical components plant construction project Environmental Impact Assessment Information Public Notice

Ltd. with an annual output of 8.2 million sets of new energy automobile and motorcycle parts and electrical components plant construction project Environmental Impact Assessment Information Public Notice

  • Categories:Company news
  • Author:
  • Origin:
  • Time of issue:2023-06-15
  • Views:0

(Summary description)Taizhou Xiongfeng Casting Co., Ltd. was established on November 05, 1999, mainly engaged in the manufacture of auto parts, motorbike parts, metal products, enterprise registered address and business address Taizhou Economic Development Zone, Development Avenue (see Annex 1 for enterprise business licence).

Ltd. with an annual output of 8.2 million sets of new energy automobile and motorcycle parts and electrical components plant construction project Environmental Impact Assessment Information Public Notice

(Summary description)Taizhou Xiongfeng Casting Co., Ltd. was established on November 05, 1999, mainly engaged in the manufacture of auto parts, motorbike parts, metal products, enterprise registered address and business address Taizhou Economic Development Zone, Development Avenue (see Annex 1 for enterprise business licence).

  • Categories:Company news
  • Author:
  • Origin:
  • Time of issue:2023-06-15
  • Views:0
Information

I. Basic information of the project

Taizhou Xiongfeng Casting Co., Ltd. was established on November 05, 1999, mainly engaged in the manufacture of auto parts, motorbike parts, metal products, enterprise registered address and business address Taizhou Economic Development Zone, Development Avenue (see Annex 1 for enterprise business licence). Enterprises in March 2015 commissioned Taizhou Environmental Science Design and Research Institute to prepare the "annual output of an additional 2.6 million sets of automobile and motorcycle parts and household appliances parts production line technology transformation project environmental impact report", and on May 11, 2015, the former Taizhou Municipal Bureau of Environmental Protection permit (see Annex 3 for details), and on October 19, 2015, through the "three simultaneous" call " acceptance (see Annex 3 for acceptance comments).

Due to the policy of "retreating two into three" of Taizhou Bay New Area, the enterprise seizes this opportunity and newly purchases a land plot on the south side of Haiyun Road and the west side of Juhai Avenue in Taizhou City, which has a site area of 19,325 square metres (33.566 acres), and a total building area of 29,958.44 square metres. Enterprises intend to invest 125.8 million yuan, the enterprise eliminated some of the old and backward equipment, the rest of the production facilities as a whole relocated to the new plant, and new advanced energy-saving heat preservation furnace, cold chamber die-casting machine, CNC machine tools, shot blasting facilities, powder spraying production line, screw air compressor, three-dimensional warehouse system and other production and auxiliary ancillary facilities, implementation of an annual production capacity of 8.2 million sets of new energy automobile and motorcycle parts and electrical components plant construction project. The project has been filed by the Administrative Approval and Investment Service Bureau of Taizhou Bay New District (Project Code: 2110-331052-04-01-702604, see Annex 2 for details).

    II. Distribution of major environmentally sensitive targets

According to the environmental functional zoning of the project site, the current status of environmental quality, the surrounding environmental conditions, etc., after site survey and investigation, to determine the main environmental protection targets of the project, the distance and distribution are shown in Table 2-1.

Table 2-1 Environmental air and sound environment protection targets

environmental element name (of a thing) UTM coordinates/m protection object Protection content points of the compass Nearest distance to plant boundary (m) environmental function area

X

Y

atmospheric environment Ng Fung village (place name)

357869.344

3156488.351

villagers Approximately 100 persons

west

1783

Secondary standards in the Ambient Air Quality Standards (GB3095-2012) and its amendment list (Announcement of the Ministry of Ecology and Environment No. 29, 2018)
Unionville

357961.043

3156082.993

villagers Approximately 120 persons

west

1850

Minfeng village (place name)

358145.203

3155681.275

villagers Approximately 90 persons

west

1898

Desheng Village

359650.438

315511.998

villagers Approximately 110 persons

southwestern

1571

Jinxingxing village, Hainan

359607.862

3154703.019

villagers Approximately 50 persons

southwestern

1963

Gao Sheng village, Hainan

359744.196

3154511.158

villagers Approximately 180 persons

southwestern

2155

Shuanghong village (place name)

359257.139

3154531.252

villagers Approximately 160 persons

southwestern

2205

Lower League Village

358952.177

3154668.124

villagers Approximately 180 persons

southwestern

2171

Surface water environment Ten Rivers

359584.084

3156534.291

underground water River width 20m

west

250

Surface Water Environmental Quality Standard (GB3838-2002) Class IV Standard
Nine rivers

359096.158

3156126.369

underground water River width 35m

west

856

Groundwater environment Plant groundwater

/

/

surface water

/

/

/

Groundwater Quality Standards (GB/T 14848-2017) Class III Standards
soil environment cropland

359139.642

3156511.082

agricultural land

/

west

604

Risk screening values in Table 1 of the Risk Control Standards for Soil Pollution on Agricultural Land of Soil Environmental Quality (for Trial Implementation) (GB15618-2018)
cropland

360054.003

3156580.992

agricultural land

/

landlord

260

III. Prediction of major environmental impacts

(1) Atmospheric environment

According to the prediction results, the contribution value of pollutant emission to the surrounding environment and sensitive points of this project is very small. The predicted results of the normal and accidental emissions from the factory boundary of the enterprise's waste gas are in line with the relevant monitoring concentration limits. Accidental emission of exhaust gas will aggravate the pollution of project exhaust gas to the environment, so the enterprise should strengthen the management and eliminate accidental emission of plant exhaust gas environmental protection facilities. The project has little impact on the surrounding environment.

(2) Water environment

The production wastewater of the project is treated by the sewage treatment station in the plant and the domestic sewage treated by the septic tank together with the municipal sewage network, sent to Taizhou City, Luqiao District, Binhai Sewage Treatment Company Limited to meet the standards of treatment and then discharged. Taizhou Luqiao Binhai Sewage Treatment Co., Ltd. water to implement the "Taizhou City, urban sewage treatment plant water indicators and standard limits (for trial implementation)" (commonly known as "quasi Ⅳ class") in the relevant standards. To sum up, after the implementation of the above measures, the project's wastewater will have little impact on the surrounding surface water environment.

(3) Sound environment

According to the prediction results, the predicted noise levels of the plant boundaries around the project can meet the Class 3 standard in the Environmental Noise Emission Standards for Factory Boundaries of Industrial Enterprises (GB12348-2008).

(4) Solid waste

Slag, aluminium ash, paint slag, waste hydraulic oil, general packaging materials, waste packaging drums, etc. will be generated during the production of this project. General solid waste can be sold to material recycling units for comprehensive utilisation after collection, and domestic rubbish will be transported by the sanitation department on a regular basis; hazardous waste should be entrusted to qualified units for disposal, and should be stored temporarily in the plant in accordance with the requirements of the relevant provisions of the "Pollution Control Standards for the Storage of Hazardous Wastes" (GB18597-2023).

Main environmental protection measures to be taken, environmental risk prevention measures and expected results
The environmental protection measures, environmental risk prevention measures and expected effects of this project are shown in Table 4-1.

Table 4-1 Summary of environmental protection measures, environmental risk prevention measures and expected effects

Form Pollutant Pollution control measures intended effect
icdustrial waste gas Pollution management measures Collection + cooling and settling + bag filter no less than 15m high exhaust DA001 Emission Standards for Air Pollutants in Foundry Industry (GB39726-2020) related standards
Natural gas flaring off-gas Collection + no less than 15m high exhaust cylinder DA002 Table 2 of Emission Standards for Air Pollutants from Industrial Furnaces (GB9078-1996)
Die casting demoulding Collection + no less than 15m high exhaust cylinder DA002 Comprehensive Emission Standards for Air Pollutants (GB16297-1996)
Shot blasting, deburring Collection + cloth bag dust removal + no less than 15m high exhaust pipe DA004 Emission Standards for Air Pollutants from Industrial Painting Processes (DB33/2146-2018)
Polishing, grinding wheels, sanding Collection + cloth bag dust removal + no less than 15m high exhaust pipe DA004
spray moulding Collection + cyclone dust removal + no less than 15m high exhaust pipe DA005 Emission Standards for Air Pollutants from Industrial Painting Processes (DB33/2146-2018)
Plastic spraying and curing exhaust

Collection + no less than 15m high exhaust DA006

Spray curing natural gas flaring off-gas Collection + no less than 15m high exhaust cylinder DA002 Table 2 of Emission Standards for Air Pollutants from Industrial Furnaces (GB9078-1996)
Oil-based paint mixing exhaust, paint spraying exhaust, paint spraying drying exhaust The spray booth adopts circulating wind process, after circulating to reach a certain concentration, it enters into the filtration + RTO device + no less than 15m high exhaust pipe to discharge DA007 together with the paint drying exhaust gas. Emission Standards for Air Pollutants from Industrial Painting Processes (DB33/2146-2018)
drain water Production wastewater, domestic wastewater The production wastewater of this project is treated by the sewage treatment station in the plant and the domestic sewage treated by septic tank is incorporated into the municipal sewage network together, and sent to Taizhou City Luqiao District Binhai Sewage Treatment Co. Standard for Comprehensive Emission of Wastewater (GB8978-1996) Level III (of which ammonia nitrogen and total phosphorus emissions are implemented in the Limits for Indirect Emission of Nitrogen and Phosphorus Pollutants from Wastewater of Industrial Enterprises (DB33/887-2013) relevant standard limits)
noises Production workshop 1、Production workshop near the factory boundary side as little as possible to set openable windows, closed doors and windows during production. 2、Strengthen the management, training and education of employees to provide civilised production to prevent man-made high noise phenomenon. Plant noise emissions to meet the "industrial enterprises plant environmental noise emission standards" (GB12348-2008) in the third category of the standard
Solid Waste (Separate General and Hazardous Solid Waste) General solid waste General industrial solid waste should be collected and stored separately and not mixed; general industrial solid waste should be collected and sold out to relevant material units No secondary pollution
Hazardous solid waste Temporary storage needs to be in accordance with the "hazardous waste storage pollution control standards" (GB18597-2023 the relevant provisions of the establishment of hazardous solid waste storage library (area of 40m2), hazardous solid waste entrusted to a unit with hazardous waste treatment qualification for reasonable disposal
(sth. or sb) else

1. This EIA requires enterprises to put the management information system of environmental protection personnel on the wall;

2、This EIA requires enterprises to do anti-corrosion and anti-seepage treatment for hazardous waste dumps;

3、This EIA requires enterprises to standardise the construction of monitoring platform;

/

V. Preliminary conclusion of environmental impact assessment

Ltd. has an annual output of 8.2 million sets of new energy automobile and motorcycle parts and electrical components plant construction project land for industrial land, does not involve ecological protection of the red line, does not touch the bottom line of local environmental quality, did not break through the local resource use on the line, in line with the "three lines and a single" control requirements. The project site selection is in line with the "three lines and one single" environmental control unit of Taizhou City, ecological and environmental access requirements and relevant national industrial policies, the emission of pollutants in line with national and provincial regulations on pollutant emission standards and key pollutant emission control requirements; in line with the main functional area planning, land use planning, urban and rural planning, national and provincial industrial policies and other requirements; in line with the "Taizhou City, three lines and one single" control requirements. industrial policies and other requirements; in line with the relevant requirements of the Environmental Impact Report on the Overall Planning of the Eastern New District of Taizhou Bay Recycling Economy Industrial Cluster (2017~2035), and in line with the requirements of the Guidelines on Environmental Access for Construction Projects in Taizhou Bay New District; and under the premise of the enterprise doing a good job of the environmental emergency precautionary measures, the project's level of risk of environmental accidents can be accepted.

Therefore, from the perspective of environmental protection, the construction of this project is feasible.

VI. Public access to the environmental impact assessment report

The public can propose to the environmental impact assessment organisation (Zhejiang Biyuntian Environmental Science and Technology Co., Ltd.) to inspect the environmental impact report of the project through letters, faxes and e-mails.

VII. Scope and main matters of soliciting public opinions

Mainly the public within the scope of project evaluation. If the public has environmental protection opinions on the project, they can put forward to the construction unit, which will truly record the opinions and suggestions of the public in the public participation survey report of the construction project, and reflect the valuable opinions and suggestions of the public to the design unit, the EIA unit and the relevant departments.

The main opinions solicited from the public include the current status of local environmental quality, the degree of understanding of the project, the degree of impact of the project production on work and life, the attitude towards the development of the enterprise as well as other opinions and suggestions.

VIII. Specific forms of soliciting public opinions

The public can feedback their opinions by telephone, fax, letter, e-mail, etc., or directly to the contact person of the construction unit or the EIA unit, in person.

(1) Construction unit contact information

Construction unit: Taizhou Xiongfeng Casting Co.

Address: Development Avenue, Economic Development Zone, Taizhou, Zhejiang, China

Contact: Mr Wang

Tel:13605769822

(2) Name and contact information of the environmental impact assessment organisation

Environmental impact assessment unit: Zhejiang Biyuntian Environmental Technology Co.

Address: Room 405, Yaoda Building, Jiaojiang District, Taizhou City, Zhejiang Province, China

Contact: Ms Xu

Tel:0576-88062808

(3) Environmental impact report approval unit

Unit Name: Taizhou Bay New District (High-tech Zone) Branch of Taizhou Municipal Ecological Environment Bureau

Address: No.9, East Section of A-Nan Avenue, Taizhou Bay New Area

Tel: 0576- 88909056

IX. Starting and ending time for public comments

The publicity time is 10 working days, and the starting and ending time of public comments is the same as the publicity time.

 

[Note]: The public is requested to provide as much detailed contact information as possible while expressing their opinions.

Taizhou Xiongfeng Casting Co.

Scan the QR code to read on your phone

Back to list
Xiongfeng

Wang Zhifeng

Xiongfeng

Cui Xueli

Add: 39 Haiyun Road, Sanjia Street, Taizhou Bay New Area, Taizhou City, Zhejiang Province

Domestic Sales Manager Cui: +86-15968686188

Foreign Sales Manager Wang: +86-15372152010

E-mail:wzf@xfzy.com.cn

Copyright © 2023Taizhou Xiongfeng Casting Co., Ltd. All rights reserved.

Powered by www.300.cn   SEO